international space station

international space station

STS-114 - Triumphant Return To Flight Of The Space Shuttle With Discovery Launch

1h ago
SOURCE  

Description

http://www.zerognews.com - STS-114 was the first Return to Flight mission since the tragic loss of Columbia Feb. 1, 2003. Two and a half years were spent researching and implementing safety improvements for orbiters and external tanks. They included greater in-depth examination of Reinforced Carbon-Carbon panels that are used on the wing leading edges, plus replacing bolts and new foam applications on the tanks. Discovery's climb to orbit was extensively documented through a system of new and upgraded ground-based cameras, radar systems and airborne cameras aboard high altitude aircraft. The imagery captured of Discovery's launch, and additional imagery from laser systems on Discovery's new Orbiter Boom Sensor System laser-scanner as well as data from sensors embedded in the shuttle's wings, helped mission managers determine the health of Discovery's thermal protection system. When Discovery neared the International Space Station early July 28, Station Commander Sergei Krikalev and Flight Engineer John Phillips used digital cameras and high-powered 800-mm and 400-mm lenses to photograph Discovery's thermal protective tiles and key areas around its main and nose landing gear doors. All imagery was downlinked to a team of 200 to analyze. Before docking with the space station, Commander Eileen Collins performed the first Rendezvous Pitch Maneuver about 600 feet below the station. The motion flipped the shuttle end over end at 3/4 degree per second, allowing Expedition 11 crew members to photograph the underside of Discovery and its heat-resistant tiles in detail. Imagery during launch showed a piece of foam being shed from the external tank, as well as smaller tile and foam dings. Imagery of the tiles showed two areas where gap fillers were protruding. Mission managers spent several days to determine if any action would be required of the crew. It was decided to allow Robinson the attempt to pull out the protruding gap fillers with his hand or with forceps, or remove the protrusions with a hacksaw. The astronauts reviewed training on using the robotic arm and worked on assembling a hacksaw if they should need it. A puffed out piece of thermal blanket near the cockpit was also identified in the imagery and became another area of concern. Tunnel tests at NASA's Ames Research Center in California and further engineering analysis showed there was little reason to be concerned about debris release during re-entry. Prior to the first spacewalk, Mission Specialist Wendy Lawrence and Pilot James Kelly guided the station's robotic arm, Canadarm2, to lift the Multi-Purpose Logistics Module Raffaello from Discovery's Cargo Bay for attachment to the Unity module. More inspections of Discovery were conducted by Mission Specialist Charles Camarda and Kelly. During the mission, astronauts tested and examined tiles in demonstration of repair techniques. Other time was spent transferring equipment and supplies on the station as well as removing and stowing the same on the MPLM Raffaello for return to Earth. Mission managers added one more day to the mission, to follow the third spacewalk. Both the Discovery crew and Expedition 11 crew paid tribute to the Columbia crew and other astronauts and cosmonauts who have lost their lives in the human exploration of space. The MPLM was unberthed from the Unity node using the station robotic arm and placed back in Discovery's cargo bay. Discovery and the MPLM carried 7,055 pounds of unneeded equipment and trash. The OBSS was berthed back in the cargo bay by the shuttle robot arm after a handoff of the boom from the station's arm.