bullet trains

bullet trains

Bullet Trains to Fast Expressways: When Can Modi Govt Give a Face Lift to Travels Across India?

2d ago
SOURCE  

Description

The second big promise from Narendra Modi government was bullet trains and fast expressways. The total cost of bullet train project is Rs 98,000 crore. The total length of corridor is 508 kms which is to be covered in 2 hours 7 minutes. It will be made using Japanese Shinkansen Technology and maximum design speed is of 350 kmph and operating speed is of 320 kmph. In 2023, approximately 13 million passengers are expected to travel on bullet train every year. For more stories http://news18.com Connect with us Facebook https://www.facebook.com/cnnnews18 Twitter https://twitter.com/news18 YouTube http://www.youtube.com/c/cnnnews18